A pre-publication checklist for model, feedstock, capacity, power, test method, recovery rate, emissions and safety claims.
Publication Guidance
- Identify the exact equipment model and configuration.
- State feedstock composition and preparation.
- Define capacity units and operating schedule.
- Tie purity and recovery values to a documented test method.
- Confirm utilities, safety controls and environmental requirements.
- Obtain engineering approval before publication.