A production line is selected around the whole project
These criteria are project-level. They are not equivalent to choosing a single machine from a catalogue.
Feedstock Condition
Chemistry, format, state of charge, contamination and whether the material is a pack, cell, mixed scrap or production sheet determine the legal and technical start of the line.
Target Capacity
Throughput is engineered after the process route is agreed. Capacity is customized; this page does not publish a confirmed range.
Recovery Objective
Reusable cells, prepared feed, black mass, metal fractions or powder / foil each imply a different process end-point and equipment set.
Plant Space
Layout, building height, maintenance access and material-flow direction constrain whether a route is compact, modular or staged across rooms.
Utilities
Power, compressed air, water, negative-pressure ducting and control architecture are sized to the full line, not to one crusher.
Safety & Environmental Requirements
Discharge, fire, explosion, dust, off-gas and local regulation decide pretreatment depth and environmental-control modules.