Skip to content
Battery Recycling Equipment Manufacturing Engineering · Manufacturing · Global Service
01 / What Problem We Solve

Battery Material Recovery Solution

Recover valuable material fractions from prepared lithium-ion battery streams through controlled classification, separation and material-specific process design.

02 / Feedstock

Materials this solution is designed to process

This solution is intended for prepared or partially processed battery material streams where valuable fractions still require classification and physical separation.

Crushed Lithium-Ion Battery Fractions

Crushed Lithium-Ion Battery Fractions

Prepared material after upstream dismantling and size reduction containing mixed metallic, plastic and active-material fractions.

Prepared Electrode Material

Prepared Electrode Material

Processed electrode-related material requiring further classification, liberation or recovery of active material and metallic fractions.

Copper-Aluminum Mixed Fractions

Copper-Aluminum Mixed Fractions

Mixed non-ferrous material produced during battery crushing and separation that requires further classification or separation.

Black-Mass-Containing Fine Fractions

Black-Mass-Containing Fine Fractions

Fine battery material containing active material together with residual metallic or lightweight impurities.

Plastic and Separator Fractions

Plastic and Separator Fractions

Lightweight non-metallic fractions separated from processed battery material and requiring controlled collection or further classification.

03 / Target Recovered Materials

Output fractions this solution is designed to recover

The final recovered fractions depend on feedstock composition, liberation quality and downstream requirements. BREM configures the separation route around the materials the project needs to recover.

Black Mass / Active Material Fraction

Black Mass / Active Material Fraction

Fine active-material-rich fraction recovered after controlled crushing, screening and separation.

Copper-Rich Fraction

Copper-Rich Fraction

Recovered copper-bearing metallic fraction separated from prepared battery material.

Aluminum-Rich Fraction

Aluminum-Rich Fraction

Recovered aluminum-bearing fraction separated from mixed processed material.

Ferrous Metal Fraction

Ferrous Metal Fraction

Magnetic metal fraction removed where ferrous components are present in the prepared feedstock.

Plastic / Separator Fraction

Plastic / Separator Fraction

Lightweight non-metallic material separated from denser metallic and active-material fractions.

04 / Recommended Recycling Process

Recommended process logic for this recovery objective

This is process logic, not a fixed production line. The final route is adjusted according to feedstock condition, required capacity and target recovered materials.

  1. 01

    Feedstock Characterization

    Confirm material composition, particle-size distribution, moisture, liberation condition and target recovered fractions before equipment selection.

  2. 02

    Controlled Liberation

    Apply appropriate size reduction or secondary liberation only where materials remain bonded or insufficiently separated.

  3. 03

    Screening & Particle Classification

    Separate coarse material, intermediate fractions and fines so each fraction can enter a more suitable downstream separation stage.

  4. 04

    Magnetic & Air Separation

    Remove magnetic material where applicable and use controlled airflow to separate lightweight fractions from denser material.

  5. 05

    Density / Physical Separation

    Use suitable gravity or other physical separation methods to improve separation of mixed metallic and non-metallic fractions.

  6. 06

    Fraction Collection & Quality Control

    Collect recovered material streams separately and evaluate whether additional classification or polishing is required for the project target.

Stages can be added, skipped or reordered after feedstock characterization and project review.

05 / Safety & Environmental Control

Safety and environmental control

Dust and fine-powder control

Coordinate screening, airflow and fine-powder collection so active material is recovered instead of lost to dust systems.

05 / Recommended Production Lines

Complete process systems that support this solution

Recommended production lines provide complete processing configurations that can be adapted to feedstock condition, required capacity and target recovered materials.

10 / Request a Technical Proposal

Request a Technical Proposal

Share feedstock condition, capacity, desired outputs and site constraints so BREM can prepare a technical proposal.